Econoburn EBW-100 Dokumentacja

Przeglądaj online lub pobierz Dokumentacja dla Grzejniki wodne i kotły Econoburn EBW-100. Econoburn EBW-100 Specifications Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - O P E R AT I N G M A N UAL

G A S I F I C A T I O N B O I L E R SE B W A N DE B W C S E R I E SH I G H E F F I C I E N C YW O O D F I R E D B O I L E R SC USI N S TA

Strona 2

BOILERS CONNECTED TO AN EXISTING SYSTEMi. Shall be installed without interfering with the normal delivery of heated water from the originalboiler.i

Strona 3

OPERATE THE (GAS, OIL, ELECTRIC) BOILER PERIODICALLY TO EN-SURE THAT IT WILL OPERATE SATISFACTORILY WHEN NEEDED.DO NOT RELOCATE OR BYPASS ANY OF THE S

Strona 4 - ERATION OF THE BOILER

FLUE PIPE AND CHIMNEY The Boiler must be located as close as possible to the chimney. It should be ducted so that there is a minimum number of elbows

Strona 5 - SPECIFICATIONS

CLEARANCES The ECONOBURN™ Wood-Fired Boiler is to be installed in accordance with the National Building Code or local regulations. Allowances front a

Strona 6 - BOILER DIAGRAM

DURING A POWER FAILURE NEVER REFUEL THE BOILER.GRAVITY LOOP (NO POWER)A normally open powered zone valve must be installed to allow a free flow of wate

Strona 7 - LOCATING THE BOILER

FREE STANDING INSTALLATION In the freestanding, or stand-alone system, the ECONOBURN™ boiler is the sole source of cen-tral heating. In this system co

Strona 8 - COMBUSTION AIR SUPPLY

13BOILER WIRING DIAGRAM FOREWB-100 EWB-500 EWB-1000Figure 3

Strona 9 - WARNING - RISK OF FIRE

14BOILER WIRING DIAGRAM FOREWB-150 EWB-200 EWB-300Figure 4

Strona 10

15Figure 5

Strona 11

16Figure 6

Strona 12 - TO THE FLUE

Manufactured by: Alternative Fuel Boilers795 Deer StreetPO Box 281Dunkirk, New York 14048United States of AmericaWebsite: www.alternativefuelboilers.c

Strona 13 - Figure 1

INSTALLERS FINAL CHECKLIST PIPING INSPECTION 1. Boiler plumbed properly?2. Is a new expansion tank or equivalent installed?3. Normally closed by-pass

Strona 14 - PLUMBING CONNECTIONS DIAGRAM

SECTION 2 – OPERATING INSTRUCTIONSINITIAL STARTUPTo remove any remaining moisture in the refractory, a small to medium fire should be main-tained for 1

Strona 15 - TIONAL AND LOCAL CODES

19CREOSOTE AND CLEANING1. Establish a routine for the storage of fuel, care of the appliance, and firing techniques.2. Check daily for creosote build

Strona 16 - EWB-100 EWB-500 EWB-1000

FLUE DRAFT CONTROL OPERATIONThe purpose of the Flue Draft Control (Fig. 6) is to prevent flames from coming out of the fire door to-ward the operator. T

Strona 17 - EWB-150 EWB-200 EWB-300

DRAFT FAN CONTROL UNITThe Draft Fan Controller (Fig.10) is an Aquastat which is set at the temperature desired for the temperature of the water jacket

Strona 18 - Figure 5

The Thermo Overload switch protects the Control Panel from any electrical shorts or power surges in excess of 5 amps with any external electrical devi

Strona 19 - Figure 6

BOILER OPERATING CHECKLISTa. Keep area around ECONOBURN™ boiler clean and clear of combustibles.b. Use only wood. DO NOT burn any other combustibl

Strona 20 - INSTALLERS FINAL CHECKLIST

SECTION 3 - MAINTENANCE AND CLEANING The ECONOBURN™ Wood-Fired Boiler must be cleaned regularly to maintain top efficiency. A good practice is to esta

Strona 21 - AUTOMATIC STOKER

ASH DISPOSAL Before removing ashes, cease refueling and allow the fire to die down. Before opening the Ash Pit door, ensure the fire in the boiler is co

Strona 22 - CREOSOTE AND CLEANING

CHIMNEY MAINTENANCEInspect monthly during heating season. For extra safety, have your chimney inspected by an ac-credited professional yearly, prior t

Strona 23

TABLE OF CONTENTSINTRODUCTION 1SPECIFICATIONS 2BOILER DIAGRAM 3SECTION 1 - INSTALLATION INSTRUCTIONSINTRODUCTION TO INSTALLERS 4APPLICABLE STANDAR

Strona 24 - Figure 10

SECTION 4 - ECONOBURN™ BOILER WARRANTYWARRANTY PERIODThe warranty period for the main boiler is 5 years against defects in workmanship. Any purchased

Strona 25 - OPENING THE FLUE GATE

INTRODUCTION Congratulations on the purchase of your new ECONOBURN™ Wood-Fired Boiler. Developed in the northeastern United States, the ECONOBURN™ Boi

Strona 26 - DOOR TO REFUEL

SPECIFICATIONSECONOBURN™ Specifications (subject to change without notice) Boiler Model EBW-100 EBW-150 EBW-200 EBW-300 EBWC-500 EBWC-1000Depth 42

Strona 27 - Figure 12

BOILER DIAGRAM3SupplyControl PanelTurbulator AgitationLeverFirebox DoorDraft Fan CoverFlue Draft HandleReturn(Lower back panel)Gasification Chamberand

Strona 28

SECTION 1 - INSTALLATION INSTRUCTIONS (Save these Instructions!) INTRODUCTION TO INSTALLERS Before installing this ECONOBURN™ Wood-Fired Boil

Strona 29 - TROUBLESHOOTING GUIDE

With the location of the boiler selected the next step is to position the unit and proceed with as-sembly. If a noncombustible base is not required EC

Strona 30

OUTSIDE COMBUSTION AIR MAY BE NECESSARY IF:1. Fans that are installed in the fuel storage area create negative pressures in the room where the solid